John Young Parkway/Sand Lake Road Single Point Interchange

Information

The project site began from commodity circle to Florida’s Turnpike overpass along John Young Parkway and from Shingle Creek Bridge to Presidents Drive along Sand Lake Road. The project approximate length along John Young Parkway was 5,100 feet and along Sand Lake Road is about 5,300 feet. The purpose of the study was to obtain information on the subsurface condition including soil and groundwater condition encountered along the roadway alignment and stormwater ponds, provided recommendations and consideration to design and construction for roadway improvements design and construction.

Services

  • Geo-Environmental

Clients

  • Government
  • Transportation

Information

The project site began from commodity circle to Florida’s Turnpike overpass along John Young Parkway and from Shingle Creek Bridge to Presidents Drive along Sand Lake Road. The project approximate length along John Young Parkway was 5,100 feet and along Sand Lake Road is about 5,300 feet. The purpose of the study was to obtain information on the subsurface condition including soil and groundwater condition encountered along the roadway alignment and stormwater ponds, provided recommendations and consideration to design and construction for roadway improvements design and construction.

Services

  • Geo-Environmental

Clients

  • Government
  • Transportation